




| Location: Barrhaven Population: 11,842 Completion: Fall 2009 |
Site servicing for 640 homes in a short period of time(3 to 4 months-including road construction) Lot and Site grading Excavation for Storm Water Management Channel and Bridge structures adjacent to |
Jock River in compliance with RVCA. Installation of Deep Collector Sanitary and Storm Box Culverts |